Application for Net Metered Electrical Generation (No Larger than 100kW)
Primary-metered facilities may be eligible for net metering but require LLP engineering plan inspection and approval prior to application process. This application is considered complete when it provides all applicable and correct information required below. Additional information to evaluate the application may be required.