Application for Net Metered Electrical Generation (no larger than 100kW)

Application for Net Metered Electrical Generation (No Larger than 100kW)

Primary-metered facilities may be eligible for net metering but require LLP engineering plan inspection and approval prior to application process. This application is considered complete when it provides all applicable and correct information required below. Additional information to evaluate the application may be required.

Address(Required)
Location of the Generating Facility (If different from above)

Contractor/Solar Panel Installer Information

Generating Facility Information

Nameplate Rating(Required)
kW
kVA
AC Volts
 
Distribution(Required)
Metering(Required)
Customer Classification(Required)
System Design Capacity(Required)
kW
kVA
 
Prime Mover(Required)

Energy Source(Required)

Is the Equipment UL1741 Listed? (If Yes, send manufacturer's cut-sheet showing UL1741 listing to NetGeneration@lakeviewlight.com)(Required)

Interconnection Member's Signature

Signature(Required)